A proposed specification for discussion with partners and funders. Every figure is a target, nothing is built, and nothing here has been agreed with SpaceX or any supplier.
- Class
- About 200 kg, the first of a series (MEPA-1). Design life of seven years or more
- Look
- Matte black carbon-fibre composite body with gold-foil accents, deep-blue solar wings and a white radiator: built to be seen, and to be copied
- Orbit
- Sun-synchronous, about 550 km, 10:30 local time: a daylight pass for the colour camera and a night pass for the thermal camera
- Colour camera
- Multispectral telescope, about 25 cm aperture, 8 bands from blue to near-infrared, about 3 m detail, swath about 25 km
- Thermal camera
- Uncooled long-wave infrared, 640 × 512 pixels, about 100 m detail, swath about 60 km, day and night
- Ship tracking (AIS)
- A receiver for ship transponder messages, so a ship seen by the cameras can be matched to its identity, and a ship with no signal is flagged as dark
- AI processors
- Two space-screened edge AI modules (one spare), each about 100 trillion operations a second (INT8), 10 to 25 W
- Memory and storage
- 16 GB of fast memory with error correction per module, 8 TB of flash holding about a month of raw imaging
- Models in orbit
- Small vision models, from tens of millions up to about 8 billion parameters (4-bit, about 5 GB): cloud rejection, ship and candidate-slick detection, download ranking
- Flight computer
- A separate, simpler radiation-tolerant computer for housekeeping and safe mode, with a watchdog that can reset the AI modules
- Power
- About 3 m² of solar wings (about 700 W peak, 300 to 350 W average) and a battery of about 1 kWh, oversized for seven years of cell ageing
- Propulsion
- A small electric (Hall-effect) thruster to hold the orbit against drag for seven years and to bring the satellite down at the end of its life
- Downlink
- X-band, up to about 600 megabits a second (about 45 GB in a ten-minute pass), via commercial ground stations
- Commands
- S-band or UHF, encrypted, with signed software and model updates
- Relay (optional)
- SpaceX Starlink laser terminal, reported at 25 gigabits a second over up to 4,000 km, for alerts within minutes. Not agreed, not required
- Pointing
- Star trackers, four reaction wheels and magnetic torquers
- Launch
- SpaceX Transporter rideshare, booked through an integrator about 12 to 18 months ahead
- In orbit
- A small model does the first pass: reject cloud, find ships and candidate slicks, rank the download queue. It runs in seconds on a few watts.
- On the ground
- The largest frontier AI models, far too big for any satellite, read the candidates with every other source (radar, ship tracks, wind, currents), write up the evidence and flag what a person must check.
- Why split it
- A model of a trillion parameters needs hundreds of gigabytes of memory and kilowatts of power. A satellite of this class has about 200 watts. So the satellite sends small, ranked packages and the ground does the thinking.
A rideshare slot has to be booked 12 to 18 months before launch, and sponsors take six to twelve months to decide. To fly around 2030 the proposal has to be selling now.
- Months 0 to 3
- The proposal package: this page, a specification, a budget, a risk list. Pitch ready.
- Months 3 to 9
- Outreach: SpaceX Starlink business team, bus makers, university partners, ESA and philanthropic funders. First free and bought imagery to prove the need.
- Months 9 to 18
- Three written quotes, a hosting or bus partner, a lawyer’s permit pathway. A funding decision.
- Months 18 to 30
- Design review, build and environmental testing. The launch slot is booked 12 to 18 months before launch.
- About years 3 to 4
- Launch and the first images. Realistically around 2030 or later.
The numbers behind the targets, worked out so that they agree with each other. All of them are open to challenge.